EAST / GesPow — Hybrid Power Backend Desk

Outages, diesel costs, power that stops at night — or a customer suddenly asking for batteries. Before anything gets bought or quoted, check the direction first.

Run a real project through a free Hybrid Power Pre-Assessment: what the information you have does and doesn't tell us, what data is still missing, and the next technical step.

If you're a power professional, the customer relationship stays yours. If this is your own site, you stay free to work with anyone.

Two ways in — pick the one that sounds like you.

Preliminary only. Not engineering design. Not quotation. Not certification. Not warranty commitment.

For site owners

I have a project — my own power problem

This block is for you if:

  • Homes and businesses in outage-prone or weak-grid areas.
  • Sites that run on diesel and want to understand storage or hybrid options.
  • People with existing solar who want night coverage or backup power.
  • Anyone planning off-grid, backup, or mobile power and unsure what to check first.

When to use it:

  • Power cuts last hours or days, and you're weighing a generator against batteries or solar.
  • Diesel fuel or fuel logistics are the pain point.
  • You have solar panels, but there's no power at night or during outages.
  • One installer gave you one option, and you want an independent direction check before committing.
  • You're planning a new site — home, shop, or farm — and want to know what to collect before talking to anyone.
  • You don't have load data or bills handy — you want to know what matters and what can wait. "Not sure" is an acceptable answer on our form.

On the form, choose "End User" as your role.

Start as an end user

For power professionals

I'm an installer, dealer, EPC, or contractor — a customer is asking

This block is for power professionals who meet storage questions before storage suppliers do:

  • Generator dealers and rental companies — your customers are going solar, asking about batteries, or complaining about fuel costs and night-long runs.
  • Solar installers and EPCs — existing PV customers asking to add storage, or grid-policy shifts pushing retrofit decisions.
  • Electrical contractors — clients naming hybrid systems ("a generator, solar panels, and a battery bank") that reach beyond your current scope.
  • Energy consultants — clients asking "is it worth it?" while you don't yet have a structured data path to answer.
  • Off-grid and microgrid integrators — island, remote, or backup-critical sites needing a direction check or a second technical opinion.
  • Distributors — defining a first storage line, and checking what a backend supplier should be asked before anything goes on the shelf.

When to use it:

  • A customer asks for battery backup or a diesel-to-hybrid upgrade — and you don't yet have a storage line to answer with.
  • A maintenance customer's fuel bills or night-long generator runs turn into an upgrade conversation.
  • An existing solar customer wants storage — retrofit routes, compatibility questions, cost conversations.
  • A project lands on your desk combining solar, a generator, and batteries — bigger than what you normally scope alone.
  • An off-grid, island, or backup-critical site wants a second technical opinion before anything is signed.
  • The data is incomplete but the customer wants a direction now — "Not sure" is an acceptable answer on our form.
  • A rental bid or site tender for events, night work, or emission-limited sites needs a pre-bid direction check.
  • You're shaping a "coming soon" storage line and want to test which demand is real before committing shelf space.

This is a working desk for live projects — not an agency-recruitment page and not a dealership program.

On the form, choose the role that fits you — the partner-referral section lets you submit on behalf of a customer, anonymously.

Start as a professional

What you get

Four things, in writing:

  1. A preliminary situation review — what the information you submit does and doesn't tell us about the project.
  2. A potential architecture direction — the roles solar, storage, a generator, and the grid could play in this kind of project. A direction, not a design.
  3. A missing-data checklist — what would be needed for any reliable sizing or quotation, and how to get it (often just recent bills or generator run-hour records).
  4. A recommended next technical step — what to verify, collect, or decide before the project moves further.
Preliminary only. Not engineering design. Not quotation. Not certification. Not warranty commitment.

If the data isn't enough for a reliable read, we say so — the honest output is a checklist, not guessed numbers.


How we treat your customers (for professionals)

How we work, as a standing principle:

This is a working principle we operate by — not a legal contract, and not a claim about your existing brand agreements.

Who you're talking to (for everyone)


How it works

  1. A project appears — your own power problem, or a customer asking for the first time.
  2. Submit the basics — location, situation, what you know, what you don't. "Not sure" answers are fine; end-customer details can be left out.
  3. We return a preliminary assessment — situation review, architecture direction, missing-data checklist, recommended next step.
  4. You decide — quote it, park it, or gather more data first. Your call, your customer.

No need to size everything before submitting. The pre-assessment happens before the quotation-design stage — so it shapes the quote instead of following it.

Your data

What happens to a submission, in plain terms:

We're a manufacturer, not a data business — the details are here to answer a project question, not to build a list.

Run a free pre-assessment on a real project

Free. No obligation. On the form, choose the role that fits you — End User if it's your own site; your professional role if you're bringing a customer's project (the partner-referral section supports anonymous submission).

Start the pre-assessment Bringing a customer's project

Submissions go to our form provider, Tally. What we do with them is set out under Your data above.